A lift up at St Brigid’s

New photos show pre-assembly of the galvanised steel lift shaft that has been constructed as part of Rork Projects’ refurbishment works at St Brigid’s in Double Bay. This significant undertaking is a holding point for the project and doubles as a secondary check for glazing measurements. Upon sign-off, the lift shaft will be disassembled and epoxy coated before being reassembled in-situ at St Brigid’s.

This is part of major refurbishment works underway for Woollahra Municipal Council. In addition to the new external lift, works include a pedestrian bridge link, new gallery and staff facilities, a new sculpture exhibition terrace, and upgrades to the external landscaping.