Rork Projects were engaged to complete 84 bathroom upgrades in 2 buildings for the Department of Treasury and Finance. The work consisted of asbestos removal, upgrade plumbing infrastructure including new stack works in both buildings. The work was extremely challenging due to the constraints of space for the decontamination setup. Working within highly secured and occupied buildings, and working to …
White Lady Funerals
Rork Projects were engaged by APP to carry out the refurbishment of the Mackay + Tanah Merah Funeral Homes. The design intent was to create a more homely feel in the homes, with updated fixtures, fittings and a new colour scheme to create a modern feel. Rork were also responsible for the installation of a new cold room at the …
Penguin Random House
Fit-out works comprised localised strip out of fixtures, fittings and equipment, saving many for later reuse; reupholster of select wall and ceiling panelling; and extensive mechanical, electrical, fire and hydraulics services works. The timber flooring was removed and replaced, partitioning and feature ceiling works completed, and joinery and steel storage units supplied and installed. Other inclusions were carpet, audio visual …
Nicholson Street Refurbishment
Engaged as the head contractor for the refurbishment of 8 levels of lobbies and amenities, as well as at construction of the new End of Trip Facilities at 1 Nicholson Street Melbourne. The Melbourne team’s scope of works included the demolition of existing facilities and construction of new Male & Female Amenities, along with DDA and end of trip facilities …
QIC Canberra – The Hub
QIC Canberra Centre appointed Rork as head contractor for the refurbishment of their old car park offices at the Canberra Centre into a boutique function venue. The venue specifically caters to the high end fashion and corporate market demanded a very high quality finish which was delivered impeccably on-time and to budget. As an Indigenous business, we proudly acknowledge that …
Mineshaft
Rork Projects were appointed to coordinate the joinery shop drawing design and construct of the new high-end retail outlet in the Canberra Centre. The retail display fit-out was constructed from a cold shell and the scope of works included the full turn-key solution, from services (elec, mech, fire and hydraulics) to all finishes, fittings, joinery, furniture and signage. As the …
Jewish Childcare and Community Centre
The building refurbishment and adaptive reuse of the former Giralang pre-school building into a childcare centre inclusive of a commercial kitchen, landscaping and renovation of the heritage-listed building structure. Works comprised piling and associated taps; civil works; excavation; slab on ground; detailed multi-pitch roofing works; electrical upgrade works (including main switchboard); new mechanical and hydraulic installation, as well as full …
GPT Group Skygardens
Works performed by Rork Projects on the Riverside Centre skygarden projects were some of the most high risk the company had taken on. Installation of architectural and structurally engineered glass and balustrading was achieved with strict safety procedures in place. All workers were made to operate in the skygardens using a static line (harness) at all times, while exclusion zones …
The Treasury
Refurbishment works included modifications to the office accommodation on levels 4A, 4C and 3C of the Treasury Building, including full services upgrades, new electrical metering, audiovisual upgrades, security upgrades, new kitchens, breakout spaces, the provision of furniture and relocation of workstations. The alterations also included lobby and full toilet refurbishment to the floors. Due to the occupied nature of the …
Australian Institute of Health and Welfare
Rork Projects were awarded the lump sum Office Interior Fitout for AIHW in Bruce, ACT. Works comprised high-end fitout of a warm shell tenancy on the first floor across 1,000m2. Major packages included feature timber cladding, floor finishes, joinery, mechanical, electrical, partitioning and a new base building DDA compliant disabled toilet facilities. Works were completed within 8 weeks on site. …