Scope of work included partial demolition of existing accessways; construction of a new first floor slab, (to facilitate the extension of existing classrooms and interconnecting corridor); new corridor; external louvres; new lift and refurbishment of existing classrooms. Works comprise asbestos removal; screw piles; groundworks; suspended first floor slab; roofing; feature louvres and full fit out.
Works were scheduled around and within a fully operational school. To ensure both safety and security standards were maintained, the construction zone was completely segregated from the school with direct access.
As an Indigenous business, we proudly acknowledge that this project was completed on the traditional lands of the the Gadigal of the Eora Nation.